Publication:
The application of total productive maintenance (TPM) to operations and maintenance facilities of Tren Urbano; case study: motor bogie

dc.contributor.advisor Bartolomei-Suárez, Sonia M.
dc.contributor.author Rullán-Bidot, Sara L.
dc.contributor.college College of Engineering en_US
dc.contributor.committee Irizarry Serrano, María
dc.contributor.committee Resto Batalla, Pedro
dc.contributor.department Department of Industrial Engineering en_US
dc.contributor.representative Baigés Valentín, Iván
dc.date.accessioned 2018-11-28T17:10:52Z
dc.date.available 2018-11-28T17:10:52Z
dc.date.issued 2006
dc.description.abstract This work presents the development of a maintenance strategy with the objective to increase efficiency, effectiveness and security of operations and processes of Tren Urbano’s Operation and Maintenance Facilities. This work will be based on a technique called Total Preventive Maintenance (TPM), an extensively proven technique that allows the development of a maintenance strategy. en_US
dc.description.abstract Este trabajo presenta el desarrollo de una estrategia de mantenimiento con el objetivo de mejorar la eficiencia, efectividad y seguridad de las operaciones y los procesos de las Instalaciones de Mantenimiento y Operaciones del Tren Urbano. Este trabajo se basa en la técnica llamada Mantenimiento Total Productivo (TPM por sus siglas en inglés), una extensa y abarcadora técnica que permite desarrollar una estrategia de mantenimiento.This work presents the development of a maintenance strategy with the objective to increase efficiency, effectiveness and security of operations and processes of Tren Urbano’s Operation and Maintenance Facilities. This work will be based on a technique called Total Preventive Maintenance (TPM), an extensively proven technique that allows the development of a maintenance strategy. en_US
dc.description.abstract Este trabajo presenta el desarrollo de una estrategia de mantenimiento con el objetivo de mejorar la eficiencia, efectividad y seguridad de las operaciones y los procesos de las Instalaciones de Mantenimiento y Operaciones del Tren Urbano. Este trabajo se basa en la técnica llamada Mantenimiento Total Productivo (TPM por sus siglas en inglés), una extensa y abarcadora técnica que permite desarrollar una estrategia de mantenimiento. en_US
dc.description.graduationYear 2006 en_US
dc.description.sponsorship Tren Urbano, Metro de Medellin, General Electric and Guidant en_US
dc.identifier.uri https://hdl.handle.net/20.500.11801/1529
dc.language.iso English en_US
dc.rights.holder (c)2006 Sara L. Rullán Bidot en_US
dc.rights.license All rights reserved en_US
dc.subject Maintenance strategy en
dc.subject Tren Urbano en
dc.subject Total Preventive Maintenance en
dc.title The application of total productive maintenance (TPM) to operations and maintenance facilities of Tren Urbano; case study: motor bogie en_US
dc.type Project Report en_US
dspace.entity.type Publication
thesis.degree.discipline Industrial Engineering en_US
thesis.degree.level M.E. en_US
Files
Original bundle
Now showing 1 - 1 of 1
Thumbnail Image
Name:
ININ_RullanBidotSL_2006.pdf
Size:
919.57 KB
Format:
Adobe Portable Document Format
Description: