Publication:
Simulation model risk-based scheduling tool for high-mix and low-volume manufacturing facility with sequence-dependent setup times

dc.contributor.advisor Torres-García, Wandaliz
dc.contributor.author Linares-Blasini, José E.
dc.contributor.college College of Engineering en_US
dc.contributor.committee Bartolomei Suárez, Sonia M.
dc.contributor.committee Rodríguez Álamo, Betzabé
dc.contributor.department Department of Industrial Engineering en_US
dc.contributor.representative Irizarry Hernández, Zollianne
dc.date.accessioned 2019-08-19T17:18:40Z
dc.date.available 2019-08-19T17:18:40Z
dc.date.issued 2019-07-11
dc.description.abstract Production scheduling in most real-world scenarios is very complex. Many of the methodologies used for creating production schedules are often deterministic which means that variation is not considered. The use of deterministic scheduling for high-mix and low-volume manufacturing facility is inefficient and obsolete due to the inherent variability and occurrence of uncertain events in the manufacturing floor. This project develops a robust scheduling tool for a high-mix low-volume manufacturing facility with sequence-dependent setup times taking into consideration some of the inherent variability of the manufacturing floor. This robust scheduling tool is created using the Simio software package to enable the creation of schedules that adjust to schedulers’ needs while incorporating manufacturing constraints. This analytical tool was created to solve an existing problem for a local industry partner and it was investigated further through a case study (i.e in-silico analysis using 10 machines). The manufacturing floor was simulated taking into consideration real-world information and simulated variability depending on which model was explored. The accuracy of the industry-driven model was verified and validated while the case study model was properly verified and studied. Experimentation with the case study model provided much-needed knowledge and understanding of the effect of dispatching rules on the completion time of manufacturing orders and the optimization of resources given a particular dispatching rule. The dispatching rule that performed the best to minimize the completion time of orders in the case study model was the Least Setup Time which prioritizes orders with the smallest setup time. Ultimately, this work developed a simulation tool that models inherent variability in a high-mix low-volume manufacturing facility with sequence-dependent setup times and feeds into the generation of risk-based schedules allowing to forecast possible tardiness before it happens and update schedules dynamically as needed. en_US
dc.description.graduationSemester Summer en_US
dc.description.graduationYear 2019 en_US
dc.identifier.uri https://hdl.handle.net/20.500.11801/2526
dc.language.iso en en_US
dc.rights.holder (c) 2019 José E. Linares Blasini en_US
dc.subject Simulation en_US
dc.subject Simio en_US
dc.subject Changeover en_US
dc.subject Risk-based Scheduling en_US
dc.subject.lcsh Production scheduling -- Simulation methods en_US
dc.subject.lcsh SIMIO en_US
dc.subject.lcsh Manufacturing industries en_US
dc.subject.lcsh Production planning en_US
dc.subject.lcsh Operations research en_US
dc.title Simulation model risk-based scheduling tool for high-mix and low-volume manufacturing facility with sequence-dependent setup times en_US
dc.type Project Report en_US
dspace.entity.type Publication
thesis.degree.discipline Industrial Engineering en_US
thesis.degree.level M.E. en_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
ININ_LinaresBlasiniJE_2019.pdf
Size:
4.7 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: